Hydraulic Lift Installation running over 2 floors at Anchor Housing’s Nene Court in Wisbech. This lift marks the 25th install for Anchor in a 30 lift portfolio MV Lifts are due to complete very soon.
Our Lift Installation teams have been working non-stop to complete these lifts on schedule and as can be seen in the Photos they have been doing a fantastic job. MV Lifts take pride in the high level of installation engineers they have, many of them are trained in-house and have been with MV Lifts for many years.