Lift Installation Essex, an EcocellĀ® evacuation Lift was the lift of choice at the newly built extension at Broadford Primary school in Romford. The EcocellĀ® lift was chosen for its unique features that include a battery backup system in case of a power outage, this allows approximately 120 floor-to-floor runs on battery power during a power outage.
The EcocellĀ® lift is exclusive to MV Lifts.
The lift runs 3 floors with a lower ground level to ensure access to all areas for disabled users and has a through car design offering dual aspect doors and operates on a priority call for staff and authorised users only.