Goods Lift Installation for the British Heart Foundation at their huge multi-level store in the heart of the City of Sheffield. This was a challenging install in an existing shaft that wasn’t built to have this size of lift with its weight carrying capacity so the walls had to be strengthened under the guidance of structural engineers.
This Goods Lift installation runs 3 floors and starts at sub-ground level, the basement is where the loading dock is with lorries coming day and night, this lift will see a hard life of service and will be used to its maximum 3500kg capacity. Lift servicing and repairs will also be carried out by MV lifts.
Images below are in order over a 10-week Goods Lift Installation period to show the progress.